Hospitality & Leisure

Fire Stopping at Harry's, Covent Garden

CLIENT

Harry's Covent Garden

LOCATION

Covent Garden, London

SECTOR

Hospitality & Leisure

Service

Fire Stopping Solutions

Harry's, Covent Garden Piazza: fire stopping for a restaurant fit-out by Zyan Fire Protection

Fire Stopping for a New Restaurant Fit-Out in Covent Garden

About the building: 11-12 Russell Street, London WC2B 5HZ. Corner unit on the Covent Garden Piazza, formerly Tuttons, around 3,100 sq ft with a large terrace. Flagship of the Harry’s Italian restaurant group, opened November 2025.

Harry’s opened a new restaurant at 11-12 Russell Street, in the centre of Covent Garden. The fit-out ran new kitchen extract, ventilation, power, water and drainage through the walls, floors and ceilings that separate the restaurant from the neighbouring premises and the floors above, and each of those openings needed fire stopping before the restaurant could open. Zyan Fire Protection carried out the fire stopping installation.

Our team sealed the service penetrations through the restaurant’s fire-rated walls, floors and ceilings with tested fire stopping systems matched to each type of service and substrate, working alongside the fit-out trades so that the fire stopping went in as the services did, not after the finishes had closed them off. Each seal was labelled and photographed for the handover file.

The fire stopping was completed as part of the fit-out, so the restaurant opened with compartmentation that meets Building Regulations and with the records its landlord and main contractor need.

Email

For enquiries related to our services, please reach out.

[email protected]

Phone

Contact us for immediate assistance or questions.

0208 798 2580

Need Fire Stopping for Your Project?

From fire stopping and fire doors to compartmentation surveys and remedial works, speak to Zyan Fire Protection about your project requirements.

PORTFOLIO

Recent Fire Protection Projects

Explore completed projects to see the fire protection work we have delivered for our clients.

Versa London Studios, Park Royal: aerial view of the studio building where Zyan upgraded compartmentation

Commercial

Acton, London W3

Versa Studios

Fire stopping installation at Versa Studios, Acton: Fire Risk Assessment actions closed out, with evidence for the assessor.

Read Case Study

Lyceum Theatre, Covent Garden: fire stopping after new fire alarm works by Zyan Fire Protection

Hospitality & Leisure

Covent Garden, London

Lyceum Theatre

Fire stopping at the Lyceum Theatre, Covent Garden: fire lines reinstated after a new fire alarm, every seal photographed for the theatre's records.

Read Case Study

NEON at Battersea Power Station: fire stopping and fire door remedial works by Zyan Fire Protection

Hospitality & Leisure

Nine Elms, London

NEON at Battersea Power Station

Fire stopping and fire door remedial works at NEON, Battersea Power Station: one contractor, one record for every seal and door.

Read Case Study