Fire Stopping in Barnet

Fire Stopping for Barnet's New Neighbourhoods, Suburban Homes and Shared Houses

BM TRADA certified fire stopping, fire doors and compartmentation surveys for new build blocks, shared homes and commercial buildings across Barnet, Finchley, Hendon, Colindale and Edgware.

Barnet has the second largest population of any London borough and is still growing. Colindale's regeneration will deliver more than 10,000 new homes, while Brent Cross Town plans 6,700. Alongside new blocks are older houses converted into flats and shared homes. Every building relies on sealed walls and floors to hold back fire, but new pipes, cables and ducts can break that seal.Zyan Fire Protection is an independent, BM TRADA certified fire stopping contractor working with main contractors, developers, landlords and managing agents across the borough. We find and seal these gaps with tested systems, providing photographs and certificates for every seal.

Recent Fire Stopping Projects Across London

Our recent work includes West End theatres, a hotel at Liverpool Street, a live venue at Battersea Power Station and a TV studio in Acton. On every job, we plan noise, dust and access around the people using the building.

Each project brought challenges found in buildings right across London: historic fabric, busy occupants and fire lines broken by other trades. We photograph each seal before it is covered, then hand over certificates, datasheets and as-built drawings, so landlords, managing agents and fire risk assessors have proof the work was done.

Lyceum Theatre, Covent Garden: fire stopping after new fire alarm works by Zyan Fire Protection

Hospitality & Leisure

Covent Garden, London

Lyceum Theatre

Fire stopping at the Lyceum Theatre, Covent Garden: fire lines reinstated after a new fire alarm, every seal photographed for the theatre's records.

Read Case Study

Savoy Theatre, Strand, London: compartmentation and fire line reinstatement by Zyan Fire Protection

Hospitality & Leisure

Strand, London

Savoy Theatre

Fire stopping at the Savoy Theatre, Strand: alarm cabling breaches sealed and recorded for the theatre's next fire risk assessment.

Read Case Study

Boroughs We Cover

We work across all 32 London boroughs, from period conversions in central London to new build blocks and industrial sites further out. Find your area below to see how we can help.

Fire Stopping in Central London

CAMDEN, ISLINGTON, KENSINGTON & CHELSEA AND WESTMINSTER

Fire Stopping in North London

BARNET, BRENT, ENFIELD, HARINGEY AND HARROW

Fire Stopping in East London

HACKNEY, NEWHAM, TOWER HAMLETS AND WALTHAM FOREST

Fire Stopping in Outer East London

BARKING & DAGENHAM, HAVERING AND REDBRIDGE

Fire Stopping in West London

EALING, HAMMERSMITH & FULHAM, HILLINGDON AND HOUNSLOW

Fire Stopping in South West London

KINGSTON, MERTON, RICHMOND AND WANDSWORTH

Fire Stopping in South London

CROYDON, LAMBETH, SOUTHWARK AND SUTTON

Fire Stopping in South East London

BEXLEY, BROMLEY, GREENWICH AND LEWISHAM

Fire Stopping Installation

In conversions, refurbishments and new builds, pipes, cables and ducts are run through fire-rated walls and floors, and every one leaves a gap. We seal each penetration with tested, certified systems that suit the building's construction, then photograph each seal before it is covered up.

What We Seal

Cavity Barrier Installation

Hidden voids behind walls, under floors and in roof spaces can carry fire unseen from one flat to the next. In older buildings, later alterations can open up new routes. We install cavity barriers in line with Building Regulations, the latest Building Control guidance and your building's fire strategy.

Barriers We Install

Fire Door Installation and Maintenance

A fire door only works when the whole set is right, from the frame and seals to the closer. For landlords, managing agents and facilities managers, we inspect, install and maintain fire doors under our BM TRADA certification, with photo evidence for every door we check.

What You Receive

Fire Compartmentation Surveys

If you do not know the condition of your building's fire compartments, a survey is the place to start. We check walls, floors, risers and voids, find every breach and give you a clear report, plus a written price for any remedial work it uncovers.

What the Survey Finds

Remedial Fire Stopping

When a fire risk assessment flags breaches, or old fire stopping no longer meets current standards, we put it right. We remove failed or non-compliant materials, reinstate them with certified systems and plan the work around residents and tenants to keep disruption to a minimum.

Common Reasons for Remedial Work

Fire Safety Rules in Barnet

If you let a shared home in Barnet, it is likely to need a licence. The council's borough-wide additional HMO licensing scheme runs from October 2022 to October 2027 and covers smaller shared homes that fall outside mandatory licensing. Our photographed seals and certificates give you clear proof that your fire safety is in order.

If you manage a block of flats over 11 metres tall, communal fire doors must be checked at least every three months and flat entrance doors every year. We carry out these checks under our BM TRADA Q-Mark fire door maintenance certification, with photographs and a report for every door.

If your home is in Hampstead Garden Suburb, it sits in a conservation area, and changes to the outside of most homes also need consent from the Hampstead Garden Suburb Trust. Listed buildings anywhere in the borough need listed building consent for works that affect their character. We survey first and use systems that suit the original construction, with a datasheet for every product used.

Commercial fire safety and compartmentation project by Zyan Fire Protection

Why Choose Zyan Fire Protection

BM TRADA Q-Mark Certified Installers

Our fire stopping, fire door installation and fire door maintenance are all third-party certified by BM TRADA. You can check the scope of each certificate in the BM TRADA certified supplier directory.

Independent Advice Led by Your Building

We are independent of manufacturers and other contractors. Whether it is a listed building or a modern block, our advice follows compliance and real risk, not a product we need to sell.

Proof of Every Seal We Install

Each seal is photographed before it is covered. You receive installation certificates, product datasheets and as-built drawings, ready for your fire risk assessor, Building Control and insurer.

Clear Advice and Fast Quotes

Your site survey is free, with no obligation. We explain what we find in plain English and offer a one-day turnaround on quotes, with nothing added that you have not approved.

FAQS

Fire Stopping in Barnet FAQs

Do you work on new build blocks in Colindale and Brent Cross?

Yes. We work with main contractors and developers to the agreed programme, sealing service penetrations in risers, plant rooms and flats before ceilings and boards close them in. You can send drawings or a package for pricing, and our Constructionline Gold and SafeContractor approvals cover your supply chain checks. The handover pack includes photographs of every seal, certificates, datasheets and as-built drawings.

Yes. Most fire stopping is internal and out of sight, in floor voids, risers and service routes. We survey first, so we understand how the building was put together before choosing a system. If any work would change the outside of the building, check with the council and the Hampstead Garden Suburb Trust whether consent is needed before it starts.

Yes. We cannot apply for a licence on your behalf, but we can check and improve the fire separation between rooms, seal gaps around pipes and cables, and repair or replace fire doors. You get a photographed, certified record of the work to keep with your licensing paperwork.

Yes. Fit-outs are one of the most common times for fire lines to be broken, because new services are run through existing compartment walls and ceilings. We seal every penetration before the finishes close over it, as we did on restaurant fit-outs in Covent Garden and at Uxbridge Station, and we record each seal for the main contractor’s handover.

The price depends on how many penetrations there are, what passes through them, how easy they are to reach and whether the building is occupied. After a free survey, you receive a written price for the agreed scope, and we offer a one-day turnaround on quotes. If you have drawings, a fire risk assessment or a list of known breaches, send them with your enquiry so we can plan the visit properly. Call 020 8798 2580 or book your survey online.

Phone

Contact us for immediate assistance or questions.

0208 798 2580

Email

For enquiries related to our services, please reach out.

[email protected]

CONNECT

Book A Free Fire Stopping Survey In London

Main contractors can send drawings or a package for pricing. Facilities managers can attach the fire risk assessment. Zak or Ryan will come back to you with a time to visit.

We use your details only to reply to this enquiry. Privacy policy