Hospitality & Leisure

Fire Stopping at Popeyes, Uxbridge Station

CLIENT

Popeyes

LOCATION

Uxbridge

SECTOR

Hospitality & Leisure

Service

Fire Stopping Solutions

Popeyes restaurant fit-out at Uxbridge Station: fire stopping by Zyan Fire Protection

Fire Stopping for a New Restaurant Fit-Out on a TfL Site

About the building: 163 High Street, Uxbridge UB8 1JZ. Ground-floor restaurant unit in the Uxbridge Station building on the High Street. Popeyes UK’s first Uxbridge site, opened August 2025.

Popeyes opened a new restaurant at Uxbridge Station, a Transport for London site on the High Street in Uxbridge. A restaurant fit-out brings new kitchen extract, ventilation, power, water and drainage through the walls, floors and ceilings that separate the unit from the station and the premises around it, and every one of those penetrations has to be fire stopped before the restaurant can open. Zyan Fire Protection carried out the fire stopping installation for the fit-out.

Working within the fit-out programme, our team sealed the service penetrations through the unit’s fire-rated walls, floors and ceilings with tested fire stopping systems suited to each type of service and substrate. A live transport site brings its own requirements for access and permits, and the work was planned to fit both the station and the fit-out programme. Each seal was labelled and photographed for the handover file.

The fire stopping was completed as part of the fit-out, so the restaurant opened with compartmentation that meets Building Regulations and with the records its landlord and main contractor need at handover.

Email

For enquiries related to our services, please reach out.

[email protected]

Phone

Contact us for immediate assistance or questions.

0208 798 2580

Need Fire Stopping for Your Project?

From fire stopping and fire doors to compartmentation surveys and remedial works, speak to Zyan Fire Protection about your project requirements.

PORTFOLIO

Recent Fire Protection Projects

Explore completed projects to see the fire protection work we have delivered for our clients.

Versa London Studios, Park Royal: aerial view of the studio building where Zyan upgraded compartmentation

Commercial

Acton, London W3

Versa Studios

Fire stopping installation at Versa Studios, Acton: Fire Risk Assessment actions closed out, with evidence for the assessor.

Read Case Study

Lyceum Theatre, Covent Garden: fire stopping after new fire alarm works by Zyan Fire Protection

Hospitality & Leisure

Covent Garden, London

Lyceum Theatre

Fire stopping at the Lyceum Theatre, Covent Garden: fire lines reinstated after a new fire alarm, every seal photographed for the theatre's records.

Read Case Study

NEON at Battersea Power Station: fire stopping and fire door remedial works by Zyan Fire Protection

Hospitality & Leisure

Nine Elms, London

NEON at Battersea Power Station

Fire stopping and fire door remedial works at NEON, Battersea Power Station: one contractor, one record for every seal and door.

Read Case Study