Hospitality & Leisure

Fire Stopping and Fire Door Remedial Works at NEON, Battersea Power Station

CLIENT

NEON

LOCATION

Nine Elms, London

SECTOR

Hospitality & Leisure

Service

Fire Stopping Solutions, Fire Doors

NEON at Battersea Power Station: fire stopping and fire door remedial works by Zyan Fire Protection

Upgrading Compartmentation at a Purpose-Built Venue

About the building: Cringle Street, Nine Elms, London SW8 5BX. Central London’s first purpose-built immersive exhibition venue, opened May 2025 beside Battersea Power Station. 3,200 sq m under a single-span roof.

NEON is a purpose-built venue on Cringle Street in Nine Elms, beside Battersea Power Station. The venue required fire stopping installation and fire door remedial works to upgrade its compartmentation, and Zyan Fire Protection was appointed to deliver both.

Our fire stopping team surveyed the venue’s fire-rated walls, floors and ceilings, identified unsealed and failed penetrations, and sealed each one with tested fire stopping systems. Our fire door team inspected the venue’s fire doors and carried out the remedial works needed to bring them back to the standard they were certified to. Every item was labelled, photographed and recorded.

Compartmentation depends on fire stopping and fire doors working together: a sealed wall is undone by a door that will not hold. With both brought up to standard, the venue’s compartmentation is upgraded and NEON holds a record of the works.

Email

For enquiries related to our services, please reach out.

[email protected]

Phone

Contact us for immediate assistance or questions.

0208 798 2580

Need Fire Stopping for Your Project?

From fire stopping and fire doors to compartmentation surveys and remedial works, speak to Zyan Fire Protection about your project requirements.

PORTFOLIO

Recent Fire Protection Projects

Explore completed projects to see the fire protection work we have delivered for our clients.

Versa London Studios, Park Royal: aerial view of the studio building where Zyan upgraded compartmentation

Commercial

Acton, London W3

Versa Studios

Fire stopping installation at Versa Studios, Acton: Fire Risk Assessment actions closed out, with evidence for the assessor.

Read Case Study

Lyceum Theatre, Covent Garden: fire stopping after new fire alarm works by Zyan Fire Protection

Hospitality & Leisure

Covent Garden, London

Lyceum Theatre

Fire stopping at the Lyceum Theatre, Covent Garden: fire lines reinstated after a new fire alarm, every seal photographed for the theatre's records.

Read Case Study

Popeyes restaurant fit-out at Uxbridge Station: fire stopping by Zyan Fire Protection

Hospitality & Leisure

Uxbridge

Popeyes Uxbridge

Fire stopping installation for the Popeyes fit-out at Uxbridge Station, a TfL site, with every seal recorded for the main contractor's handover.

Read Case Study